1. Feasibility
Confirm business terms, use feasibility, infrastructure, preliminary layout and major cost/timing risks.
Use the key points below to make the real-estate decision easier to evaluate, then turn the requirement into a live search.
Work backward from the desired opening date. Medical and dental projects often depend on multiple approvals and vendors.
Confirm business terms, use feasibility, infrastructure, preliminary layout and major cost/timing risks.
Align delivery condition, TI, schedule responsibilities and legal terms with the intended project.
Architectural, MEP and specialty planning around the actual practice workflow and equipment.
Submit required plans and respond to review comments. Timelines vary by project and jurisdiction.
Coordinate landlord and tenant work, long-lead items, inspections and change management.
Install equipment/IT/furniture, complete inspections, licensing steps and operational move-in.
Do not assume lease signing equals immediate buildout. Ask the project team to identify critical-path approvals, long-lead equipment and dependencies before committing to a target opening date.
If timing is critical, include the desired opening date in your search so we can screen for spaces with lower buildout exposure.